After erection on falsework, 368 ft structure weighing 775 tons was floated on barges 80 mi and placed in position on Great Northern branch with aid of tidal movements; bridge site involved is navigable arm of salt water which links Padilla and Skagit bays on upper Puget Sound in western Washington; approaches give structure total length of 944 ft. (see also Ry Track and Structures v 49 n 8 Aug 1953 p 734-5)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    This new swing span towed to site


    Weitere Titelangaben:

    Ry Age


    Erschienen in:

    Railway Age ; 155 , n 4 ; p 55-57


    Erscheinungsdatum :

    1953


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    This new swing span towed to site

    Engineering Index Backfile | 1953


    SPEED REDUCTION SWING ASSIST DEVICE, TOWED VEHICLE, AND CONNECTION VEHICLE

    FUKUTOME HIDEKI | Europäisches Patentamt | 2023

    Freier Zugriff

    Moving railway swing span at Burlington beach

    Engineering Index Backfile | 1931


    TOWED VEHICLE MANAGEMENT SYSTEM, TOWED VEHICLE MANAGEMENT METHOD, AND TOWED VEHICLE MANAGEMENT PROGRAM

    MIURA YOSHIKO / SHIMADA KOJI / OMIYA KIYOHIDE | Europäisches Patentamt | 2020

    Freier Zugriff

    Offloading line made up onshore, towed to site

    Abel, W. / Brown, R.J. | Tema Archiv | 1978