Jan. no. 1, pp. 241-250: Efficiency of equipment; proper use of stock pile and modern steel bins; subgrade practice; finishing method, etc. Feb. pp. 269-276: Organization and equipment of concrete-paving operations. Mar. pp. 18-24, 9 figs.: Speeding up construction work. (See also - vol. 6, nos. 9 and 10, Nov. and Dec. 1925, pp. 194-202 and 220-232, 5 figs., and nos. 11, 12)
Efficiency in concrete road construction
Pub. Roads
United States Department of Agriculture -- Public Roads ; 7 , n 1 ; Various pages
1926
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Efficiency in concrete road construction
Engineering Index Backfile | 1926
|Efficiency in concrete road construction
Engineering Index Backfile | 1925
|Engineering Index Backfile | 1918
|Concrete with modified joints for road construction
British Library Conference Proceedings | 1993
|Industrial railway for conveying materials in concrete road construction
Engineering Index Backfile | 1914