Author lists operations in their sequence as dismantling, cleaning, inspection, estimating, assembling, running-in, testing, and final inspection.
Engine overhauling in fleet maintenance
Soc. Automotive Engrs. -- Jl
Society of Automotive Engineers -- Journal ; 19 , n 2
1926
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
Multifunctional overhauling device for railway maintenance
Europäisches Patentamt | 2024
|