Renewal of railway bridge at Birmingham, over Western Region tracks, British Railways; bottom chord of single truss was so heavily corroded as to require strengthening and decking had to be replaced; tension in chord was reduced by prestressing load of 230 tons applied through eight Macalloy bars of 1 in. diam. (see also Engineering v 181 n 4707 May 25 1956 p 408-9)
Railway bridge repair
Engineer
Engineer ; 201 , n 5229
1956
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
The raising and repair of the railway bridge at Houplines
Engineering Index Backfile | 1919
|Engineering Index Backfile | 1931
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1925