To maintain passenger services of London Underground Railway system, site of 30 acres, between Chiswick Park and Acton Town stations was acquired in 1922; works laid out so as to deal with 40 cars per week; new system provides for dismantling and reassembling of car-body equipment and trucks, car painting, and repair work, carried out with work in continuous movement; five main shops, known as lifting, truck, body, paint, and woodworking shops. (See also Engineering vol. 125, no. 3254, May 25, 1928 pp. 645-648, 5 figs.; Tramway and Ry. World, vol. 63, no. 29, June 14, 1928, pp. 290-295, 8 figs.)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Rolling-stock overhaul works of the London underground railways


    Weitere Titelangaben:

    Elecn


    Erschienen in:

    Electrician ; 100 , n 2608


    Erscheinungsdatum :

    1928


    Anmerkungen:

    1 Fig.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :




    Overhaul of underground rolling stock

    Engineering Index Backfile | 1947


    New rolling stock for London underground railways

    Engineering Index Backfile | 1938


    New rolling stock for London underground railways

    Engineering Index Backfile | 1938