New works at Tilbury include entrance from river on west side of dock, drydock entering from main dock, and landing stage for ocean steamers, adjoining L.M.S. railway station; works at West India and Millwall docks comprise series of communication passages connecting group of four docks in order that each may be served by new entrance lock, being constructed on east side of south dock. (partly on p. 40)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Improvements at the Tilbury, west India and Millwall Docks


    Weitere Titelangaben:

    Engineer


    Erschienen in:

    Engineer ; 146 , n 3783


    Erscheinungsdatum :

    1928


    Format / Umfang :

    3 pages


    Anmerkungen:

    10 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Tilbury docks improvements

    Engineering Index Backfile | 1929


    Tilbury docks improvements

    Engineering Index Backfile | 1929


    Tilbury docks improvements

    Engineering Index Backfile | 1926


    Deepwater cargo jetty: tilbury docks

    Engineering Index Backfile | 1921