Description of reconstruction and development works; it is suggested that use of precasting has permitted rapid construction of permanent wharf facilities with minimum of site labor and advantages of factory-like control of concrete and steelwork in casting yard; trade of port has doubled in past 25 yr and should continue to increase, future requirements being considered in proposed development plan.
Port of Hobart, Tasmania
Dock Harbour Authority
Dock and Harbour Authority ; 40 , n 472
1960
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
Engineering Index Backfile | 1949
|Extent of Mobile Phone Use by Pedestrians on Controlled Crossings in Central Hobart, Tasmania
DOAJ | 2019
|The port of Devonport, Tasmania
Engineering Index Backfile | 1930
|