New lay-by jetty is 976 ft 9 in. long and is at angle of 24° to line of King's Dock Lock; area lying to northwest of jetty and towards River Tawe has been dredged to enable 20,000-ton vessels to swing and return to sea if necessary; roundhead was reconstructed, and new pumping station added.
Swansea docks entrance works
Dock Harbour Authority
Dock and Harbour Authority ; 42 , n 490
1961
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1963
|Southampton docks improvement works
Engineering Index Backfile | 1940
|Southampton docks extension works
Engineering Index Backfile | 1929
Half-shaft manufacture at the Ford works at Swansea
Tema Archiv | 1975
|Engineering Index Backfile | 1957