Butt welding of rails by Thermit process into continuous length on experimental section of track one mi long by Bessemer and Lake Erie Railroad, for purpose of determining longitudinal and lateral movements and extent of stresses induced by variations in temperatures by means of permanent monuments and strain gage readings.
Mile-long rails installed in GEO test tract
Ry Eng Maintenance
Railway Engineering and Maintenance ; 32 , n 6
1936
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Jersey Central lays 78-ft. Rails in two-mile test track
Engineering Index Backfile | 1944
Noise Reduction Effect of Low Barriers Installed Adjacent to Rails
British Library Online Contents | 2012
|Noise Reduction Effect of Low Barriers Installed Adjacent to Rails
Online Contents | 2012
|Engineering Index Backfile | 1936
|Engineering Index Backfile | 1936
|