Outline of project for construction of dam across Columbia River, including spillway section 1100 ft long, 75 ft high; construction of cofferdam; details of power installation, navigation lock, railroad and highway relocation, and fishways.
Bonneville dam
Military Engr
Military Engineer ; 27 , n 153
1935
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Kraftfahrwesen | 1987
SLUB | 2011
|