The invention discloses prefabricated building component hoisting equipment and an offset monitoring method thereof. The prefabricated building component hoisting equipment comprises two parallel cross beams, wherein tower frames are arranged at the two ends of each cross beam correspondingly, and the end parts of the cross beams are correspondingly arranged on the tower frames; rails are arrangedon the cross beams correspondingly, and a bridge crane is arranged between the rails of the two cross beams in an erected mode; and the prefabricated building component hoisting equipment further comprises a data receiver, each tower frame is provided with a coordinate measuring module, so that coordinates of the coordinate measuring modules are obtained in real time through the data receiver. According to the prefabricated building component hoisting equipment, the bridge crane is arranged in an erected mode, and components can be accurately conveyed to mounting parts, so that quick assemblyis realized, the construction efficiency is improved, and the economic cost and the time cost are saved; and in addition, the bridge crane is good in running stability, high in working efficiency andsuitable for construction of prefabricated buildings with various components, and the offset conditions of the tower frames can be monitored in real time by arranging the coordinate measuring modulesand the data receiver, so that the safety performance of the equipment is improved.

    本发明公开了一种装配式建筑构件吊装设备及其偏移监测方法,该装配式建筑构件吊装设备包括两根相平行的横梁,各横梁的两端分别设有塔架,横梁的端部对应安装在塔架上;横梁上分别设有轨道,在两根横梁的轨道之间架设有桥式吊车;还包括数据接收器,在各塔架上分别设有坐标测定模块,以通过数据接收器实时获取坐标测定模块的坐标。该装配式建筑构件吊装设备通过架设桥式吊车,能够将构件准确的传送到安装部位,实现快速装配,提高施工效率,节省经济成本和时间成本;另外,桥式吊车的运行稳定性好,工作效率高,适于用于构件繁多的装配式建筑物的施工,而通过设置坐标测定模块和数据接收器,可实时监测塔架的偏移情况,提高设备的安全性能。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Prefabricated building component hoisting equipment and offset monitoring method thereof


    Weitere Titelangaben:

    装配式建筑构件吊装设备及其偏移监测方法


    Beteiligte:
    CHEN WUXIN (Autor:in) / LYU XIUJUAN (Autor:in) / SONG HAIWEI (Autor:in) / SU KAI (Autor:in) / BAI XUEFENG (Autor:in) / ZHANG KE (Autor:in) / ZHAO QIANGQIANG (Autor:in) / ZHANG HONGBO (Autor:in) / XU JIANKUN (Autor:in) / LANG ZIYUE (Autor:in)

    Erscheinungsdatum :

    23.06.2020


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    E04G SCAFFOLDING , Baugerüste / B66C Krane , CRANES



    Prefabricated building prefabricated wallboard hoisting equipment

    CHEN LILI / YAO CHANGQIAO / XUE MOQUAN | Europäisches Patentamt | 2023

    Freier Zugriff

    Prefabricated building prefabricated part hoisting equipment and operation method thereof

    GONG ZIANG / ZHUO LINGJUN / LIN ZHONGCAI et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Hoisting equipment for prefabricated building prefabricated components

    YANG XUEYING | Europäisches Patentamt | 2021

    Freier Zugriff

    Hoisting equipment for prefabricated building

    YU HONGBO / ZHANG SHIYI / JIANG ZHIFENG et al. | Europäisches Patentamt | 2020

    Freier Zugriff

    Prefabricated building upstairs hoisting equipment

    YAO DONGHUI / HU QIANG / LU ZHENYANG et al. | Europäisches Patentamt | 2023

    Freier Zugriff