In this elevator, each of a plurality of first support arms is affixed to a first building column. Each of a plurality of second support arms is affixed to a second building column. A first counterweight rail bracket is affixed to each of the first support arms. A second counterweight rail bracket is affixed to each of the second support arms. A first counterweight guide rail is affixed to the plurality of first support arms via the plurality of first counterweight rail brackets. A second counterweight guide rail is affixed to the plurality of second support arms via the plurality of second counterweight rail brackets.
在电梯中,多个第一支承臂分别固定于第一建筑柱。多个第二支承臂分别固定于第二建筑柱。在各第一支承臂固定有第一对重导轨托架。在各第二支承臂固定有第二对重导轨托架。第一对重导轨借助多个第一对重导轨托架固定于多个第一支承臂。第二对重导轨借助多个第二对重导轨托架固定于多个第二支承臂。
ELEVATOR AND REFURBISHING METHOD THEREFOR
电梯及其改造方法
21.08.2020
Patent
Elektronische Ressource
Chinesisch
IPC: | B66B Aufzüge , ELEVATORS |