The embodiment of the invention provides a formwork system of a floating structure foundation and a rapid forming method of a concrete floating foundation. The formwork system comprises a double-layer bag body structure and a rigid opening part. A top opening of the double-layer bag body structure is fixed to the rigid opening part, and a closed inner cavity is formed by the double-layer bag body structure and the rigid opening part; the double-layer bag body structure is formed by folding an inner layer of flexible material and an outer layer of flexible material with different sizes, and a top opening of the double-layer bag body structure is formed by an opening in any shape in the top of the inner and outer flexible materials; the rigid opening part is made of a single or composite rigid structure, is provided with a pouring gate, and can form different opening types through a connecting assembly; according to the floating structure foundation, the high-strength and high-durability composite material can be directly formed by the hardened poured high-performance and high-fluidity concrete material and the high-strength flexible material, the durability such as corrosion resistance of the floating structure foundation is improved, dock prefabrication and underwater hauling are not needed, and technical support can be provided for offshore operation.
本申请实施例提供一种浮式结构基础的模板体系及混凝土浮式基础快速成型方法,模板体系包括双层囊体结构和刚性开口部;所述双层囊体结构的顶部开口固定在所述刚性开口部,与所述刚性开口部形成封闭的内部空腔;所述双层囊体结构以内外两层尺寸不同的柔性材料折叠构成,通过内外柔性材料的顶部任意形状的开口构成所述双层囊体结构的顶部开口;所述刚性开口部以单一或复合刚性结构制成,设置有浇筑口,且能够通过连接组件形成不同开口型式;本申请能够通过浇筑的高性能、高流动性的混凝土材料硬化后直接与高强柔性材料形成高强度高耐久性复合材料,提高浮式结构基础的抗腐蚀等耐久性能,无需船坞预制下水拖运,可为海上作业提供技术支持。
Formwork system of floating structure foundation and rapid forming method of concrete floating foundation
浮式结构基础的模板体系及混凝土浮式基础快速成型方法
29.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |