The modularized water surface operation platform comprises a floating body module assembly, the floating body module assembly comprises at least two floating bodies, the adjacent floating bodies are connected into a whole through a connecting structure, the connecting structure comprises module interfaces and a connector assembly, the four side faces of each floating body are provided with the module interfaces of longitudinal groove structures respectively, and the module interfaces of the longitudinal groove structures are connected with the connector assembly. The module interface comprises a groove, the groove vertically penetrates through the floating body, and limiting ribs are fixedly connected to the opposite groove walls in the groove respectively; the connector assembly comprises a first connecting block and a second connecting block, the first connecting block and the second connecting block are connected through a safety rope, clamping grooves are formed in the two sides of the first connecting block and the two sides of the second connecting block respectively, and the clamping grooves are used for being clamped with the limiting ribs in the grooves of the adjacent floating bodies. And a hoisting device is also arranged on the floating body. Through the structure, quick mounting and dismounting of the floating body module assemblies are achieved, and after the floating body module assemblies are connected into a whole, the structural strength is high.

    一种模块化水面作业平台及其安装方法,包括浮体模块组件,浮体模块组件包括至少两个浮体,相邻的浮体之间通过连接结构连接成整体,连接结构包括模块接口和连接器组件,浮体的四个侧面分别设置有纵向槽结构的模块接口,模块接口包括凹槽,凹槽上下贯穿浮体,凹槽内相对的槽壁上分别固接有限位筋条;连接器组件包括第一连接块和第二连接块,第一连接块和第二连接块之间通过安全绳连接,第一连接块和第二连接块的两侧分别设置有卡槽,卡槽用于与相邻浮体凹槽内的限位筋条卡合;浮体上还设置有吊装装置。通过上述结构,实现浮体模块组件的快捷安装和拆卸,并且浮体模块组件在连接成整体后,结构强度高。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Modularized water surface operation platform and installation method thereof


    Weitere Titelangaben:

    一种模块化水面作业平台及其安装方法


    Beteiligte:
    WANG YUANZHI (Autor:in) / ZHAO CHUNLU (Autor:in) / XU JIAMING (Autor:in) / YAN JINGYUAN (Autor:in) / TU XINGYI (Autor:in) / WEN YANXIANG (Autor:in) / LIU LEI (Autor:in) / LI MENGQIAO (Autor:in) / ZHANG JING (Autor:in) / YAN FEI (Autor:in)

    Erscheinungsdatum :

    27.12.2024


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS



    Modularized water surface operation platform

    ZHAO CHUNLU / ZHU QUANPING / ZHANG DINGHUA et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Modularized operation platform

    LIU JIANBEN / YANG WEIWEI / XU NING | Europäisches Patentamt | 2023

    Freier Zugriff

    Modularized iron bird platform undercarriage installation method

    TAN BING / ZHANG JIAFEI / WANG PENGYUN et al. | Europäisches Patentamt | 2025

    Freier Zugriff

    Modularized installation method for ocean platform deck gap

    HUANG SHANTIAN / LI HUAILIANG / XIE WEIWEI et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Modularized intelligent overwater unmanned operation platform

    CHENG QI / GUO XIAOFA / ZHONG LEI et al. | Europäisches Patentamt | 2022

    Freier Zugriff