The invention discloses a 110 kilovolt power transmission line equipment mounting and conveying device and a construction method, the equipment mounting and conveying device comprises a wire rod and two groups of wire assemblies, the upper part of the wire rod is provided with an equipment mounting rack, and the wire assemblies are arranged on the wire rod; the two wire guide assemblies are located on the wire rod above the equipment mounting rack and the wire rod below the equipment mounting rack respectively, the top of the wire rod is connected with a buckle cover through a bolt, the top of the buckle cover is provided with a top wire guide wheel, a second pull wire is arranged between the top wire guide wheel and the two ends of the wire guide assembly, and one end of the second pull wire is connected with the equipment. And the other end of the second stay wire is connected with the winding assembly. The first stay wire is arranged between the inserting rod and the ground, the situation that equipment collides with the mounting frame or a wire rod is avoided, the service life of the equipment is prolonged, the winding assembly is arranged, the equipment can be rapidly hoisted to the mounting position, the hoisting safety and stability are guaranteed, and the hoisting device is convenient to use, easy to operate and easy to popularize.

    本发明公开了一种110千伏输电线路设备安装传送装置及施工方法,其中:设备安装传送装置包括线杆和导线组件,在线杆的上部设置有设备安装架,在线杆上设置有导线组件,导线组件为两组,分别位于设备安装架上方的线杆上和设备安装架下方的线杆上,在线杆的顶部通过螺栓连接有扣盖,在扣盖的顶部设置有顶部导线轮,在顶部导线轮与导线组件的两端之间设置有第二拉线,第二拉线的一端与设备连接在一起,第二拉线的另一端与绕线组件连接在一起。本发明通过在插杆与地面之间设置第一拉线,避免设备与安装架或线杆出现碰撞的情况,延长设备的使用寿命,通过设置绕线组件,能够快速将设备吊装至安装位置,保证吊装的安全性和稳定性,使用方便,操作简单,易于推广。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    110 kilovolt power transmission line equipment mounting and conveying device and construction method


    Weitere Titelangaben:

    一种110千伏输电线路设备安装传送装置及施工方法


    Beteiligte:
    CHENG SHENG'AN (Autor:in) / GAO FENG (Autor:in) / DANG KUN (Autor:in) / LYU MINGHUI (Autor:in) / WANG LIPING (Autor:in) / LI XIN (Autor:in) / XIE YAFEI (Autor:in) / LI HONGYANG (Autor:in) / WU ZHIJIE (Autor:in) / LI JING (Autor:in)

    Erscheinungsdatum :

    11.04.2025


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    B66C Krane , CRANES / H01F MAGNETS , Magnete



    Simple hoisting tool for 110 kilovolt power transmission line tower operation construction and construction method

    WANG SHAOHUI / HAN SONG / LIU XINYI et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Installation and construction method of 750-kilovolt GIS equipment

    ZHANG LINGLI | Europäisches Patentamt | 2021

    Freier Zugriff

    Simple hoisting tool for 110 kilovolt power transmission and transformation construction operation and construction method

    DING WENTIAN / CAO GUOJI / GOU PEIPEI et al. | Europäisches Patentamt | 2024

    Freier Zugriff


    Hoisting equipment for 35 kilovolt PT

    WANG JING / XU PENG / TIE BO et al. | Europäisches Patentamt | 2023

    Freier Zugriff