The invention provides a steering oar thruster installation process and a ship, and relates to the field of ship manufacturing, the steering oar thruster installation process comprises the steps that a thruster is transported to the position below the tail of the ship, and hoisting is started through a lifting appliance; horizontally hoisting the propeller, hoisting the top of the propeller after the propeller reaches a specified position, and keeping the height of the rotating center point of the tail unchanged; the top lifting rope is tightened, and meanwhile, the tail lifting rope is loosened, so that the propeller is gradually vertical; and after the propeller is vertical and the position is checked to be correct, the propeller is fixed. The steering oar propeller provided by the invention is simple and practical in installation process, the installation of the propeller can be efficiently and quickly completed, and the ship building and installation cost is saved.
本发明提供一种舵桨推进器安装工艺及船舶,涉及船舶制造领域,包括将所述推进器运至船舶尾部下方,使用吊具,开始吊装;水平吊装推进器,到达指定位置后,将推进器顶部吊起,使尾部的旋转中心点的高度不变;收紧顶部吊绳,同时放松尾部吊绳,使推进器逐渐竖直;所述推进器竖直后,核对位置无误后,将其固定。本申请提供的舵桨推进器安装工艺简单,实用,能够高效快速的完成推进器的安装,节约船舶建造和安装成本。
Steering oar propeller installation process and ship
一种舵桨推进器安装工艺及船舶
23.05.2025
Patent
Elektronische Ressource
Chinesisch
Ship steering by propeller shrouds
Engineering Index Backfile | 1968
|Lifting type propeller platform for ship propeller installation
Europäisches Patentamt | 2021
|Container ship propeller replacement and installation method
Europäisches Patentamt | 2025
|