A climbing device for carrying out a movement relative to a tower, to a part-ring segment for a tower, to a tower, to a wind power installation, and to a method for producing a tower. A climbing device for carrying out a movement relative to a tower, comprising a main body having a longitudinal extent from a first end to a second end, wherein the second end in an operating state faces a foundation of a tower; at least one first climbing element having an extent between a first inner end and a first holding end; at least one second climbing element having an extent between a second inner end and a second holding end; wherein the first climbing element is disposed and configured for carrying out a first holding movement of the first holding end relative to the main body, by way of a first holding movement direction that is orthogonal to the longitudinal extent, and/or for carrying out a first climbing movement of the first holding end relative to the main body.
STEIGVORRICHTUNG ZUR AUSFÜHRUNG EINER BEWEGUNG RELATIV ZU EINEM TURM UND VERFAHREN ZUR HERSTELLUNG EINES TURMS
CLIMBING DEVICE FOR CARRYING OUT A MOVEMENT RELATIVE TO A TOWER AND METHOD FOR PRODUCING A TOWER
DISPOSITIF DE MONTÉE POUR LA RÉALISATION D'UN MOUVEMENT PAR RAPPORT À UN MÂT ET PROCÉDÉ DE FABRICATION D'UN MÂT
02.11.2022
Patent
Elektronische Ressource
Deutsch
Europäisches Patentamt | 2017
|Europäisches Patentamt | 2024
|Verfahren zum Errichten eines Turms einer Windenergieanlage
Europäisches Patentamt | 2017
|