Method for installing a heavy lift crane system at a hoisting site. The crane system comprises a circular slew track assembly (1) extending over at least a slew arc about a slew center (2) and a crane (20) with a crane carriage configured to travel over the track arrangement, a main boom (40), a back mast (50), an adjustable length arrangement (60) between the back mast (50) and the main boom (40). The method comprises arranging a connector strut (80) underneath the horizontal back mast (50), pivotally connecting an upper end of the connector strut (80), pivoting the back mast (50) into an inclined raised position, arranging a counterweight (70) at the slew center (2), bringing the connector strut (80) into a substantially vertical orientation above the counterweight (70), connecting a lower end of the connector strut (80) to the counterweight (70), and raising the main boom (40).
INSTALLING A HEAVY LIFT CRANE SYSTEM AT A HOISTING SITE
INSTALLATION EINES SCHWERLASTKRANSYSTEMS AN EINEM HEBEPLATZ
INSTALLATION D'UN SYSTÈME DE GRUE DE LEVAGE LOURD AU NIVEAU D'UN SITE DE HISSAGE
25.06.2025
Patent
Elektronische Ressource
Englisch
IPC: | B66C Krane , CRANES |
INSTALLING A HEAVY LIFT CRANE SYSTEM AT A HOISTING SITE
Europäisches Patentamt | 2024
|Hoisting process of engineering ship platform heavy lift crane
Europäisches Patentamt | 2021
|Stepped hoisting system and hoisting method for heavy bridge crane
Europäisches Patentamt | 2021
|