Prepreg tows are placed on a substrate having a bend with a curvature extending over a transition region in the substrate. The tows are steered and laid on the substrate in at least a first section and a second section within the transition region, wherein each of the first and second sections has an angular orientation that is less than the curvature of the bend in order to reduce gathering of the tows.

    기층에 있는 천이 영역에 걸쳐 연장하는 곡선부를 갖는 굽힘부를 구비하는 기층 위에 수지 함침 토우가 배치된다. 상기 토우는 상기 천이 영역 내에서 적어도 제1 섹션과 제2 섹션으로 적층되고 조종되며, 각각의 상기 제1 섹션과 제2 섹션은, 상기 토우의 뭉침이나 몰림을 감소시키기 위하여 상기 굽힘부의 곡선부보다 작은 각 방위를 갖는다.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    PLACEMENT OF PREPREG TOWS IN HIGH ANGLE TRANSITION REGIONS


    Weitere Titelangaben:

    큰 각도 천이 영역에 수지함침 토우의 배치방법


    Beteiligte:

    Erscheinungsdatum :

    02.10.2015


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Koreanisch


    Klassifikation :

    IPC:    B64F GROUND OR AIRCRAFT-CARRIER-DECK INSTALLATIONS SPECIALLY ADAPTED FOR USE IN CONNECTION WITH AIRCRAFT , Boden- oder Flugzeugträgerdeckeinrichtungen besonders ausgebildet für die Verwendung in Verbindung mit Luftfahrzeugen



    PLACEMENT OF PREPREG TOWS IN HIGH ANGLE TRANSITION REGIONS

    ANDERSON DONALD A / HUGHES JESSICA R | Europäisches Patentamt | 2018

    Freier Zugriff

    PLACEMENT OF PREPREG TOWS IN HIGH ANGLE TRANSITION REGIONS

    DONALD A ANDERSON / JESSICA R HUGHES | Europäisches Patentamt | 2015

    Freier Zugriff

    Placement of prepreg tows in high angle transition regions

    Europäisches Patentamt | 2021

    Freier Zugriff

    Einfluss einer online Bahnkorrektur auf die Materialeigenschaften von Prepreg Tows im Fiber Placement Prozess

    Nguyen, Duy Chinh / Krombholz, Christian / Röstermundt, Dirk | Deutsches Zentrum für Luft- und Raumfahrt (DLR) | 2012

    Freier Zugriff

    Pushboats and integrated tows

    Hardy, A.C. | Engineering Index Backfile | 1957