A section of a node of the station is a section with an arch roof and a straight wall of three underground floors, a first underground floor is a station hall floor 1, and a second underground floor is a platform floor 2 of a subway line A and a third underground floor is a platform floor 3 of a subway line B; and directions of the subway line A and the subway line B are orthogonal. Second lining structures of the first and second underground floors are firstly constructed, and after a shield tunneling machine is pushed through the station, the structure of the third underground floor is constructed by a reverse construction method. Thus, the present disclosure is conducive to improving the efficiency of overall construction, guaranteeing timely tunnel construction completion of two lines and hence timely track construction completion and electricity wiring completion.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Undercutting-covered excavation semi-reverse construction method of cross-transfer subway station


    Beteiligte:
    LEI GANG (Autor:in) / YANG ZHIHUI (Autor:in) / HUA FUCAI (Autor:in) / XIE CHAO (Autor:in) / ZHU JIANYE (Autor:in) / LI CHAO (Autor:in) / LI NINGNING (Autor:in) / ZHOU TINGTING (Autor:in)

    Erscheinungsdatum :

    10.09.2024


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Englisch


    Klassifikation :

    IPC:    E21D SHAFTS , Schächte / B61B RAILWAY SYSTEMS , Eisenbahnanlagen



    Special-shaped subway station combined foundation pit reinforcement excavation construction system and method

    YANG FAN / ZHAN FUMIN / ZHOU PING et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Subway underground excavation construction material hoisting device

    MA WENSHUAI / CAO XINYAN / ZHAO XIA et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Study of Influence of Subway Station Excavation on Existing Metro Deformation

    Li, Y.-P. / Wang, Z.-Y. | British Library Conference Proceedings | 2009



    Assembled subway station and construction method thereof

    DING XIANLI / XIANG BAO / NONG XINGZHONG et al. | Europäisches Patentamt | 2024

    Freier Zugriff