A method for controlling a boom of a crane includes saving, in a memory, data representing a maximum horizontal working distance for a load on a hook of a boom, saving, in the memory, boom data representing the position of the boom, calculating a minimum vector between the position of the hook and the maximum horizontal working distance, and controlling, by the computing device, movement of the boom to prevent the vector from reaching a zero magnitude.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    CRANE FUNCTION PERFORMANCE ENHANCEMENT FOR NON-SYMMETRICAL OUTRIGGER ARRANGEMENTS


    Beteiligte:

    Erscheinungsdatum :

    01.03.2018


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Englisch


    Klassifikation :

    IPC:    B66C Krane , CRANES



    CRANE FUNCTION PERFORMANCE ENHANCEMENT FOR NON-SYMMETRICAL OUTRIGGER ARRANGEMENTS

    BENTON JOHN F / SCHOONMAKER STEPHEN J | Europäisches Patentamt | 2021

    Freier Zugriff

    Crane function performance enhancement for non-symmetrical outrigger arrangements

    BENTON JOHN F / SCHOONMAKER STEPHEN J | Europäisches Patentamt | 2020

    Freier Zugriff

    CRANE FUNCTION PERFORMANCE ENHANCEMENT FOR ASYMMETRICAL OUTRIGGER ALIGNMENT

    JOHN F BENTON / STEPHEN J SCHOONMAKER | Europäisches Patentamt | 2018

    Freier Zugriff