A train control system includes an onboard unit configured to be installed in a locomotive of a train, a back office server system, a hazard management system, and a communication network configured to interface with the onboard unit, the back office server system and the hazard management system, wherein the hazard management system is configured to collect and process hazard related information, and wherein the hazard management system is configured to determine vital and non-vital hazard information based on the hazard related information and to communicate the vital and non-vital information to the onboard unit.
TRAIN CONTROL SYSTEMS WITH HAZARD MANAGEMENT AND ASSOCIATED METHODS
09.05.2024
Patent
Elektronische Ressource
Englisch
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
TRAIN CONTROL SYSTEMS WITH HAZARD MANAGEMENT AND ASSOCIATED METHODS
Europäisches Patentamt | 2024
|Train control systems with hazard management and associated methods
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2025
|British Library Conference Proceedings | 1994
|