Noyo River and Harbor, California Design for Wave Protection Supplemental Tests: Coastal Model Investigation
1989
Report
Elektronische Ressource
Englisch
DDC: | 620 |
HENRY – Bundesanstalt für Wasserbau (BAW) | 1994
|Noyo Harbor, California, Breakwater Stability and Transmission Tests
HENRY – Bundesanstalt für Wasserbau (BAW) | 1995
|Ventura Harbor, California, Design for Wave and Shoaling Protection: Coastal Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1991
|Oceanside Harbor, California Design for Harbor Improvements: Coastal Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1992
|