Through flow statistics and site surveys, the study put forward a comprehensive improvement program for the intersection near Jinan long-distance passenger transportation bus station,including a combination of engineering renovation measure which mainly advocated to build underground passage and management measure which focused on redesigning signal control program. By comparing the saturation of intersection before and after improvement, it verified that the improvement program is effective .
Research on Improvement of Intersection Traffic near Jinan Long-Distance Passenger Transportation Bus Station
01.06.2012
485156 byte
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Passenger Flow Simulation Method for Long-distance Bus Station
British Library Conference Proceedings | 2010
|