During rail operations, unforeseen events may cause timetable perturbations, which ask for the capability of traffic management systems to reschedule trains and to restore the timetable feasibility. Based on an accurate monitoring of train positions and speeds, potential conflicting routes can be predicted in advance and resolved in real time. The adjusted targets (location-time-speed) would be then communicated to the relevant trains by which drivers should be able to anticipate the changed traffic circumstances and adjust the train's speed accordingly. We adopt a detailed alternative graph model for the train dispatching problem. Conflicts between different trains are effectively detected and solved. Adopting the blocking time model, we ascertain whether a safe distance headway between trains is respected, and we also consider speed coordination issues among consecutive trains. An iterative rescheduling procedure provides an acceptable speed profile for each train over the intended time horizon. After a finite number of iterations, the final solution is a conflict-free schedule that respects the signaling and safety constraints. A computational study based on a hourly cyclical timetable of the Schiphol railway network has been carried out. Our automated dispatching system provides better solutions in terms of delay minimization when compared to dispatching rules that can be adopted by a human traffic controller


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Conflict Resolution and Train Speed Coordination for Solving Real-Time Timetable Perturbations


    Beteiligte:
    D'Ariano, A. (Autor:in) / Pranzo, M. (Autor:in) / Hansen, I.A. (Autor:in)


    Erscheinungsdatum :

    01.06.2007


    Format / Umfang :

    745491 byte




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Timetable simulation by sophisticated conflict resolution between train paths

    Groger, T. | British Library Conference Proceedings | 2004


    Running time re-optimization during real-time timetable perturbations

    D Ariano, A. / Albrecht, T. | British Library Conference Proceedings | 2006


    Train timetable generation system, train timetable generation device, and train timetable generation method

    YASUMOTO MASAHIRO / HORI SATORU / SHIMURA AKITOSHI | Europäisches Patentamt | 2015

    Freier Zugriff

    TIMETABLE CREATING DEVICE, TRAIN CONTROL SYSTEM, AND TIMETABLE CREATING METHOD

    TSUTSUMI YUHI / MAEKAWA KEIJI / KIMURA SHOTA et al. | Europäisches Patentamt | 2023

    Freier Zugriff