The Autonomous Landing and Hazard Avoidance Technology (ALHAT) Project is studying the lunar landing descent phase from lunar orbit to the surface. In this paper, we give an overview of the timing and ΔV implications for key activities during the lunar landing approach phase. Timing and ΔV performance are evaluated while varying the approach phase design and key hazard detection parameters. Results show that there are significant system tradeoffs when considering ΔV, hazard detection schemes, and the time available for crew to select a safe point to land.
Approach phase ΔV considerations for lunar landing
01.03.2009
1083404 byte
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
LUNAR LANDING PROPULSION CONSIDERATIONS
NTRS | 1963
|Control considerations for lunar soft landing
Engineering Index Backfile | 1961
|Lunar Landing Site Hazard Assessment Approach
AIAA | 2023
|Lunar Landing Site Hazard Assessment Approach
TIBKAT | 2023
|Lunar Landing Site Hazard Assessment Approach
TIBKAT | 2023
|