Several alternative lane merge strategies have been proposed in recent years to process vehicles through work zone lane closures more safely and efficiently. Among these is the late merge. With the late merge, drivers are instructed to use all lanes to the merge point and then take turns proceeding through the work zone. Its efficiency has been tested on only a limited basis. The purpose of this project was to determine when, if at all, deployment of the late merge was beneficial. The late merge concept was evaluated by comparing it to the traditional merge using computer simulations and field evaluations. Computer simulations included analysis of 2-to-1, 3-to-1, and 3-to-2 lane closure configurations to determine its impact on throughput and the impact of factors such as free flow speed, demand volume, and percentage of heavy vehicles.
Evaluation of the Late Merge Work Zone Traffic Control Strategy
2004
72 pages
Report
Keine Angabe
Englisch
Transportation & Traffic Planning , Transportation , Transportation Safety , Road Transportation , Merging , Work zones , Traffic control devices , Highway safety , Construction sites , Lane closures , Lane changing , Traffic flow , Traffic demand , Traffic volume , Computer simulations , Evaluation
Field Evaluation of Late Merge Work-Zone Traffic Control
British Library Conference Proceedings | 2005
|Traffic Flow Characteristics of the Late Merge Work Zone Control Strategy
Online Contents | 1999
|Traffic Flow Characteristics of the Late Merge Work Zone Control Strategy
Transportation Research Record | 1999
|Part 2: Work Zone Traffic Control: Field Evaluation of Late Merge Traffic Control in Work Zones
Transportation Research Record | 2005
|PART 2--WORK ZONE TRAFFIC CONTROL: Field Evaluation of Late Merge Traffic Control in Work Zones
Online Contents | 2005
|