As part of COMNAVFACENGCOM's Fleet Mooring Maintenance (FMM) Program, CHESNAVFACENGCOM has been assigned the responsibility to conduct the underwater inspections of fleet moorings worldwide. This plan provides guidelines for the underwater inspection of 11 fleet moorings operated and maintained by the Puget Sound Naval Shipyard (PSNSY), Bremerton, WA. The inspection is scheduled to take place during the mid-August time frame. CHESNAVFACENGCOM has designated an Engineer-in-Charge (EIC) to provide on-site technical guidance to Underwater Construction Team Two (UCT 2) which was tasked by CINCPACFLT message 210331Z August 1982 to perform the underwater portion of the inspection. In addition, the EIC will prepare the post inspection report which will include the results of the inspection and recommendations for required maintenance actions.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Puget Sound Naval Shipyard Bremerton Fleet Moorings Underwater Inspection Plan


    Erscheinungsdatum :

    1983


    Format / Umfang :

    36 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch