The restraints are described which inhibit the Fort St. Vrain (FSV) Nuclear Power Station, a high temperature gas cooled reactor (HTGR) plant, from achieving full power operation with high availability. The actions necessary to overcome these restraints are outlined. The restraints originated from problems in both hardware related and institutional areas. The report summarizes what has been accomplished, what is currently being done, and what should be done to resolve the problems. (ERA citation 06:033300)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Fort St. Vrain Improvement Program Plan. Draft Final Report


    Erscheinungsdatum :

    1980


    Format / Umfang :

    119 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch