The primary objective was to determine the capability of the Services to use the vessel for deploying selected heavy, outsized LOTS equipment to a site where fixed port facilities do not exist. Of special interest was the loading of a DeLong B barge with a 300-ton capacity crane on it, which is used as a barge- temporary container discharge facility (TCDF). The SEABEE is the only ship with the lift potential to deploy this item.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    SEABEE Pretest Results of the Joint Logistics-over-the-Shore (LOTS) Test and Evaluation Program


    Beteiligte:
    H. Knight (Autor:in) / H. Casey (Autor:in) / G. Holiday (Autor:in) / W. Sutherland (Autor:in) / A. Green (Autor:in)

    Erscheinungsdatum :

    1977


    Format / Umfang :

    61 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch