The Army's new advanced helicopter, AH-64 relies on automatic test equipment (ATE) at aviation intermediate maintenance (AVIM) units for testing and diagnosis of faulty components removed from the aircraft. The Army is planning to provide one ATE station to each division and corps aviation brigade AVIM unit that supports the AH-64. Our independent analysis indicates that one ATE per AVIM may be sufficient only if the mean time between removal of AH-64 line replaceable units is 6 to 8 flying hours or greater, a figure that, though perhaps achievable, is twice that demonstrated so far in operational testing.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    AH-64 Automatic Test Equipment Requirements


    Beteiligte:
    F. Nauta (Autor:in)

    Erscheinungsdatum :

    1982


    Format / Umfang :

    91 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Equipment test requirements

    Carter, N. J. | British Library Conference Proceedings | 1990


    Automatic test equipment

    Tema Archiv | 1980



    B-2 automatic test equipment

    Carleton, D.L. | IEEE | 1993