The project consists of the construction of a new turning basin, deepening of the existing harbor entrance channel, and construction of a wharf, and attendant shore-based facilities. Environmental impacts are discussed.
Trident Wharf and Turning Basin, Naval Ordnace Test Unit, Port Canaveral, Florida
1974
58 pages
Report
Keine Angabe
Englisch
Port Canaveral North Cargo Berth 5 & 6 Wharf
ASCE | 2013
|Port Canaveral Cruise Terminal 3 Wharf Design and Construction
TIBKAT | 2019
|Northside Container Yard Port Canaveral, Florida
British Library Conference Proceedings | 1998
|