The United States Army Aviation Systems Test Activity conducted an Army Preliminary Evaluation of the improved Cobra armament system. The testing was accomplished in three phases: (1) handling qualities, (2) jettison envelope monitoring and verification, and (3) helmet sight subsystem qualitative evaluation.
Army Preliminary Evaluation Improved Cobra Armament System
1972
81 pages
Report
Keine Angabe
Englisch
Aircraft , Fire Control & Bombing Systems , Helicopters , Aircraft fire control systems , Weapons , Aircraft equipment , Stability , Maneuverability , Aircraft ammunition , Failure(Mechanics) , Simulation , Weight , Vibration , Airspeed indicators , Calibration , Jettisonable equipment , Helmets , Gun sights , Acceptability , Oscillation , Air to surface missiles , Wire guidance , Helmet sights , H-1 aircraft , M-28 helmet sights , 40-mm guns , Ah-1q aircraft , Gunships , M-28a1 helmet sights , Tow missiles
NTIS | 1970
US army conventional armament program buildup
Kraftfahrwesen | 1982
|Cobra revival . US Army plans for Cobra-Huey upgrades
Online Contents | 1996