Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. The following is a list of the procedures used for acceptance testing of each system: Azusa system; Electrical system; Flight control system; Inertial guidance system; Instrumentation Beacon system; Propellant utilization system; Propulsion system; Range safety command system; and Telemetry system.
Factory Acceptance Testing of Missile 40E
1961
65 pages
Report