Stress Analyses were performed on the following aircraft modifications: AT1108 Antenna Installation, HF Longwire Installation, UPS-192 Antenna Installation, 437S-1C Antenna Installation, and SATCOM Antenna Installation. The detailed conclusions of each of the topics above are contained after each sub-analysis. However, the general conclusion is that each of the subject modifications in no way impare the airworthiness of the aircraft in that the aircraft strength is equal to or greater than the original unmodified strength. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Stress Analysis of Aircraft Modifications (C-141B Aircraft). Joint Airborne Communications Center/Command Post (JACC/CP) Provisions


    Beteiligte:
    D. B. Ragan (Autor:in)

    Erscheinungsdatum :

    1980


    Format / Umfang :

    159 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch






    C-141B StarLifters repaired

    Online Contents | 1994


    Aircraft seat deployable bridge table, mounting provisions, and storage provisions

    MCKEE ERIC M / SMITH BRADLEY J / BOWDEN ROHN A et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    AIRCRAFT SEAT DEPLOYABLE BRIDGE TABLE, MOUNTING PROVISIONS, AND STORAGE PROVISIONS

    MCKEE ERIC M / SMITH BRADLEY J / BOWDEN ROHN A et al. | Europäisches Patentamt | 2020

    Freier Zugriff