The proposed plan for shoreline protection and beach restoration consists of the construction of about 760 feet of revetment along Kahului Beach Road, the placement of about 11,000 cubic yards of sand along the southern shoreline of Kahului Harbor, and construction of one groin extension, two new groins, and one breakwater to protect the sand placement. Impacts related to the construction period include some turbidity of the water, disturbance to fish and marine life, and some interference with recreational activities. The revetment will prevent further erosion of the western shoreline and maintain continued, safe use of Kahului Beach Road. The sand placement and protective structures will result in increased beach area and consequently, greater recreational use along the southern shore.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Prevention and Mitigation of Shore Damages, Kahului Harbor, Maui, Hawaii


    Erscheinungsdatum :

    1973


    Format / Umfang :

    42 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch






    Wave Response of Kahului Harbor, Maui, Hawaii

    Thompson, Edward F. / Hadley, Lori L. / Brandon, Willie Ann et al. | HENRY – Bundesanstalt für Wasserbau (BAW) | 1996

    Freier Zugriff