The results of analysis and tests conducted to define the basic 1-m beam configuration required, and the design, development, fabrication, and verification tests of the machine required to automatically produce these beams are presented.
Space Fabrication Demonstration System: Executive Summary
1979
35 pages
Report
Keine Angabe
Englisch
Astronautics , Manned Spacecraft , Manufacturing Processes & Materials Handling , Beams (Supports) , Construction materials , Large space structures , Machinery , Space manufacturing , Systems engineering , Aluminum , Manufacturing , Performance tests , Remote handling , Solar power satellites , Thermal stability
Space Station Executive Summary
NTIS | 1972
Space station executive summary
NTRS | 1972