Interface verification equipment project plans, schedules and cost estimates are presented that include delivery to the customer and a preliminary operations support plan describing responsibilities and procedures for configuration control and logistics support during the operational phase. Documentation requirements for post delivery setup and initial operational certification, recertification, facilities support, scheduled maintenance, operational maintenance, handling, transportation, and operational procedures are identified. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Shuttle Payload Interface Verification Equipment Study. Volume 4: Project Plans


    Erscheinungsdatum :

    1976


    Format / Umfang :

    71 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch