Interface verification equipment project plans, schedules and cost estimates are presented that include delivery to the customer and a preliminary operations support plan describing responsibilities and procedures for configuration control and logistics support during the operational phase. Documentation requirements for post delivery setup and initial operational certification, recertification, facilities support, scheduled maintenance, operational maintenance, handling, transportation, and operational procedures are identified. (Author)
Shuttle Payload Interface Verification Equipment Study. Volume 4: Project Plans
1976
71 pages
Report
Keine Angabe
Englisch