Ways to increase Ariane's performance are suggested. Increase in payload capability to 1950 kg by an increase in Viking 4 and 56 chamber pressures from 54 to 58 bar, and an increase in third-stage tank capacity from 8 to 10 t (tanks carrying only 9.5 t in this step) is possible. Increase in payload capability to 2300 kg by the addition of two 6 t strap-on boosters on the first stage, and full third-stage tanks (10 t) is feasible. A lengthening of the fairing by 300 to 500 mm to accommodate 2 STS/PAM-D satellites may also be envisaged.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Increased Performance for Ariane


    Beteiligte:
    A. LeMarchand (Autor:in)

    Erscheinungsdatum :

    1978


    Format / Umfang :

    4 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Ariane Launch Performance

    M. Gilli | NTIS | 1978


    Ariane 4 and Ariane 5 performance for the '90s and beyond

    HEYDON, DOUGLAS / WEINRICH, ECKARD | AIAA | 1992


    ARIANE RESUMES

    Bigot, Charles | Online Contents | 1994


    Les lanceurs Ariane 4 et Ariane 5

    Laporte-Weywada, H. | Tema Archiv | 1992


    ARIANE 5

    Pirard, Theo | Online Contents | 1996