Payload development and design load requirements for the U.S. National Space Transportation System (STS) are discussed. The STS requires that all payloads be compatible with STS verification loads which are calculated approximately one year prior to launch. Payload design and all verification testing are completed prior to this final load cycle. Various approaches to preliminary design loads, load updates, and test load definitions and also to STS model and forcing functions revisions are presented.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    STS (Astro Missions) Payload Design Load Evolution


    Beteiligte:
    D. A. Hamilton (Autor:in) / D. C. Wade (Autor:in)

    Erscheinungsdatum :

    1989


    Format / Umfang :

    6 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    STS payload design load evolution

    Hamilton, David A. / Wade, Donald C. | NTRS | 1989




    Payload missions integration

    Mitchell, R. A. K. | NTRS | 1983


    Payload Missions Integration

    R. A. K. Mitchell | NTIS | 1983