Cost estimating relationships are presented along with their statistical properties for the development phase and production phase for aircraft airframe programs. These relationships were derived for the engineering, tooling, manufacturing, and materials subdivisions of work during each phase. Cost estimating relationships are also presented for development support and flight test operations during the development phase. The purposes of the separation of costs by phase and by subdivision of work are to obtain better discounted dollar comparisons of different aircraft vehicles, to estimate the costs of vehicle programs with limited production requirements, and to evaluate the impact of technology advances affecting different subdivisions of work in different phases of the vehicle program.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Cost Estimating Relationships for Airframes in the Development and Production Phases


    Beteiligte:
    D. G. Eide (Autor:in)

    Erscheinungsdatum :

    1980


    Format / Umfang :

    50 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Cost-Estimating Relationships for Aircraft Airframes

    G. S. Levenson / S. M. Barro | NTIS | 1966


    Cost-estimating relationships for aircraft airframes

    United States Air Force Project Rand | TIBKAT | 1972


    Cost-Estimating Relationships for Aircraft Airframes

    G. S. Levenson / H. E. Boren / D. P. Tihansky et al. | NTIS | 1972



    A simple method of estimating the maintenance cost of airframes

    Eduardo Salamanca, H. / Luis Quiroz, L. | Emerald Group Publishing | 2005