Initial zone technology implementation at the Philadelphia Naval Shipyard (PNSY) in 1986 set the stage for one of the most significant shifts in culture and repair philosophy ever witnessed at a public naval shipyard. Attempting to fundamentally change the way that the shipyard conducted business forced senior and middle management to completely understand the dynamic and interrelated processes that were utilized to perform depot level work. Through the Philadelphia Quality Process (PQP), this understanding was achieved and changes that were necessary to shift from a Ship Work Breakdown Structure (SWBS) to a Product Work Breakdown Structure (PWBS) began.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    National Shipbuilding Research Program, 1992 Ship Production Symposium Proceedings, Paper No. 4B-1: Corporate Repair Philosophy and Measuring for Continuous Improvement at Philadelphia Naval Shipyard


    Beteiligte:
    L. R. Baun (Autor:in) / R. G. Gorgone (Autor:in)

    Erscheinungsdatum :

    1992


    Format / Umfang :

    22 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch