This report covers AGE for LCS equipment and operations for the NASA Ranger Program at the AMR, Air Force Missile Test Center, Launch Complex No. 12, Cape Canaveral, Florida. LCS provides equipment for monitoring and controlling the Agena vehicle supplies equipment for distribution of electrical power used in monitoring and controlling the launch pad and countdown operations. The LSC equipment also initiates and monitors simulated flight conditions of the Agena on the launch platform, and monitors and controls the equipment which is used for the subsystems of the Agena. These subsystems are: Subsystem B, Pneumatic and Propulsion; Subsystem C, Electrical Power; Subsystem D, Guidance; Subsystem H, Communications and Control. Agena subsystems and program requirements personnel determine which portions of the subsystems must be monitored, controlled, or recorded. Subsystems changes are instituted according to the requirements of the flight missions and the program objectives.
Nasa AMR Aerospace Ground Equipment Engineering Analysis Report. Revision B, Volume III. Launch Control Systems
1962
108 pages
Report
Keine Angabe
Englisch
Space Launch Vehicles & Support Equipment , Manned Spacecraft , Rocket Engines & Motors , Common Carrier & Satellite , Electrotechnology , Launch vehicles , Ground support equipment , Command and control systems , Checkout equipment , Power supplies , Electrical equipment , Test facilities , Microwave communications , Display systems , Control panels , Television display systems , Monitors , Microwave networks , Liquid propellant rocket engines , Spacecraft , Lunar probes , Communication equipment , Very high frequency , Transporter erectors , Checkout procedures , All inertial guidance , Agena , Atlas , Ranger spacecraft
Engineering institutions launch aerospace partnership
Emerald Group Publishing | 1998