Urban arterial work zones have several unique characteristics which have not been addressed in previous work zone research. The research study was established to identify these characteristics and to develop guidelines for traffic control in urban arterial work zones. Study activities including a literature review, analysis of accident, traffic volume, and travel time data from three study sites, surveys of motorists, a study of arterial lane closure capacity, and analysis of other factors were used to identify the unique characteristics of urban arterial work zones and develop the guidelines related to those unique characteristics. A number of guidelines were developed addressing several topics including: project and work activity scheduling, construction planning, speed control, intersections, signalized intersections, construction signing, lane closures, channelizing devices, median crossovers, pavement markings, public relations, accidents, and inspection of traffic control devices. The Executive Summary (Volume 1) contains all of the guidelines developed in the course of the research study. It also includes a very brief description of the research activities. Volume 2 is the technical report which describes all of the study activities in detail. It also describes the basis for each of the guidelines developed in the course of the research study.
Traffic Control Guidelines for Urban Arterial Work Zones. Volume 1. Executive Summary
1992
31 pages
Report
Keine Angabe
Englisch
Road Transportation , Transportation & Traffic Planning , Transportation , Urban highways , Construction site traffic control , Arterial highways , Highway maintenance , Lane closures , Pavement markings , Reviews , Traffic management , Highway usage restrictions , Detours , Construction site signals