The report presents the results of a data collection effort on a freeway corridor. The procedures used for collecting and analyzing the data are presented. All data required for the evaluation of the surface street models and in the application of the developed freeway corridor model are enclosed.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Freeway Operations Study-Phase IV. Data Collection and Analysis for the Eastshore Freeway (I-80) Corridor


    Beteiligte:
    R. G. Dowling (Autor:in) / A. D. May (Autor:in)

    Erscheinungsdatum :

    1974


    Format / Umfang :

    223 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Freeway Operations Study-Phase III. Progress Toward a Freeway Corridor Model

    M. P. Orthlieb / S. Roedder / A. D. May | NTIS | 1973



    Freeway Corridor Management

    C. L. Dudek / G. L. Ullman | NTIS | 1992


    The FREQ3 Freeway Model. Freeway Operations Study. Phase III

    W. A. Stock / R. C. Blankenhorn / A. D. May | NTIS | 1973