The project consists of initial construction of a 2-lane expressway with passing lanes in the foothills. Provisions have been provided for ultimate conversion of the route to a freeway. The new routing will replace 18.4 miles of existing state highway 20 in Yuba County. An adverse environmental effect will be the removal of orchard lands from production to provide right of way. The project unavoidably intrudes into the Spenceville Wildlife Area.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Proposed Freeway Development of Route 20 Between East City Limit of Marysville and the Nevada County Line in Yuba County, California


    Erscheinungsdatum :

    1971


    Format / Umfang :

    68 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch