Presented in viewgraph format, status of Tropical Rainfall Measuring Mission (TRMM) Project in National Space Development Agency of Japan (NASDA) are outlined. Topics addressed include: NASDA's role and organization related to TRMM Project; cooperation and responsibility with other organizations; altitude profile of TRMM orbit; mission analysis; status of H-2 launch vehicle, new launch site, and launching schedule; technical interface between H-2 launch vehicle and TRMM, and TRMM S/C (Spacecraft) and rain radar; new phase budget proposal; and schedule of TRMM Project in NASDA.
Status of TRMM (NASDA)
1990
14 pages
Report
Keine Angabe
Englisch
Meteorological Data Collection, Analysis, & Weather , Japanese spacecraft , Meteorological radar , Rain , Remote sensing , Satellite-borne radar , Tropical meteorology , Project management , Radar measurement , Japanese space program , Meteorological parameters , Mission planning , Remote sensors , Scheduling , Tropical regions , Foreign technology
NASDA Plans November Launch for ETS-7 and TRMM
British Library Online Contents | 1997
Current Status of NASDA Debris Mitigation Standards
British Library Conference Proceedings | 1997
|Status of the NASDA microgravity programs
AIAA | 1996
|CURRENT STATUS OF NASDA TERMINOLOGY DATABASE
Online Contents | 2002
|