Projects have been programmed to improve an inadequate portion of State Road 32 from a point south of Gallup northward to Gallup. Normal highway construction particularly the disturbing of plant cover and earth areas will cause some dust conditions during the period of construction. The improved vertical alignment and wider roadway section will allow vehicles to maintain a more constant speed and should reduce somewhat vehicle noise, particularly from large trucks. No distruption of present grazing operations are anticipated. Construction of the projects will have no direct effect on water in the immediate area.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Project S-1300(14), 8 Miles South of Gallup North and Project S-1300(15), 13.5 Miles South of Gallup North


    Erscheinungsdatum :

    1971


    Format / Umfang :

    8 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch