The material in this Data Package is divided into sections as follows: a corrected comparison of LaGuardia (LGA) Experiments 2 and 9; the results of two new LGA sensitivity runs, Experiments 54 and 55, which reflect both 1978 GA traffic and 1978 ATC separations in 1982 and 1987, respectively; the revised results of the LGA west taxiway experiments; the results of several sensitivity tests of the west taxiway experiments, and a summary of case-specific separations.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    New York Airports Data Package Number 9, John F. Kennedy International Airport, La Guardia Airport. Airport Improvement Task Force Delay Studies


    Erscheinungsdatum :

    1980


    Format / Umfang :

    57 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch