The overall purpose of the study project was to assess the practicality of the total ship OPEVAL for a conventional (production vice R and D) ship program. This report contains an overview of the Navy T and E actions that were taken to implement the policies of DOD Directive 5000.3. A detailed analysis of the ship acquisition T and E process is provided, from which a model is generated to serve as a framework for analyzing the marginal utility of adding a total ship OPEVAL to this process. Three considerations emerge which lead to the conclusion that an OPEVAL would be impractical in all cases (except the R and D case, which was not considered): (1) there are inherent constraints and artificialities in such an exercise; (2) the objectives are already achieved under the existing ship T and E process, and (3) there would be a negligible return on investment. A recommendation is made that DOD Directive 5000.3 be revised to reflect the conclusions of this report and that two Navy T and E guidance manuals be revised to reflect the conceptualization of the ship acquisition T and E process described in the report. Recommendations are made for several follow-on study projects. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    An Assessment of the Practicality of a Total Ship OPEVAL


    Beteiligte:
    M. T. Reynolds (Autor:in)

    Erscheinungsdatum :

    1976


    Format / Umfang :

    56 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Summary of FlightDeck Observer Data from SafeFlight 21 OpEval-2

    K. M. Joseph / D. Domino / V. Battiste et al. | NTIS | 2003




    Airport surface moving map displays: OpEval-2 evaluation results and future plans [4363-27]